Practical field guide
We help HR leaders design structures that match the work: job families, positions, reporting lines, spans of control, vacancies and acting arrangements.
The short answer#
A good organisation structure shows how work actually gets done: which positions exist, which job family each belongs to, who each position reports to, how wide each manager's span of control is, which seats are vacant, and who's acting in a role while its holder is away. Most org charts show the formal structure. The useful question is whether that structure matches real accountability. Where it doesn't, decisions stall, approvals go to the wrong person and nobody can say who owns an outcome.
Design the structure around positions, not people. Review spans and layers against the work, record acting arrangements with end dates, and test the chart against the decisions people really make. This guide ends with an organisation design review worksheet you can run on any unit.
What are the building blocks of an organisation structure?#
Job families. Groups of related jobs that share skills and career paths, like nursing, finance or field operations. Job families make it possible to compare pay, plan careers and build capability frameworks across the whole organisation.
Positions. Individual seats, each linked to one job, one unit, one manager position, an FTE and a funding source. The structure is a tree of positions, and people occupy them.
Reporting lines. Each position reports to one manager position. Matrix relationships (a dotted line to a project or functional lead) can exist, but one line is the line of accountability for approvals, performance and safety.
Vacancies. A position with no occupant. Vacancies are a structural fact, not a recruitment status. A vacant position still has a manager, a budget and work that someone is covering.
Acting arrangements. A temporary assignment of a person to a position they don't substantively hold, usually with higher duties pay, a start date and an end date. Acting arrangements are where formal structure and real accountability drift apart most often.
How wide should spans of control be?#
There's no universal right number, but there are useful ranges. A manager of highly standardised, rostered work (a contact centre team or a ward of nursing assistants) can support more people than a manager of complex, varied work (a team of senior engineers or clinical specialists). As a working guide:
| Work type | Typical span |
|---|---|
| Standardised, rostered frontline work | 10 to 20 |
| Professional or mixed work | 6 to 10 |
| Complex, specialist or senior work | 4 to 7 |
Spans of one or two usually point to a structure built around people rather than work: a "manager" title created to recognise seniority, or a layer left over from a past restructure. Spans above 20 usually mean one-to-ones, development and safety oversight are being squeezed.
Layers matter too. Count the reporting levels from the CEO to the frontline. Every extra layer slows decisions and dilutes accountability, so each layer should do management work the layer above it can't.
How do you spot the gap between formal and real accountability?#
Look for these signs:
- Approvals that skip the line. If leave and expenses for a team are routinely approved by someone other than the formal manager, the chart is wrong or the delegation is.
- Long-running acting arrangements. Someone who's been "acting" for 18 months is doing the job. Either confirm the appointment or end the arrangement.
- Managers of vacant positions only. A manager whose direct reports are all vacant positions isn't managing people, and the work is being covered by someone the chart doesn't show.
- People reporting to vacant positions. When a manager leaves and nobody's reassigned, their team reports to an empty seat. Approvals then default to whoever's available.
- Shadow structures. Rosters, project teams and committees that make the real decisions while the formal structure sits unused.
The test is simple: pick five real decisions from last month (a hire, a roster change, a spend approval, a safety action, a performance issue) and trace who actually made them. Compare with the chart.
How should acting arrangements be managed?#
Treat every acting arrangement as a dated record, not a note. It needs the substantive holder, the acting person, the start date, the planned end date, the reason, any higher duties allowance, and what happens to the acting person's own position while they're away. Review any arrangement that passes its end date without being extended or ended.
If your award or agreement sets rules on higher duties pay, the effective dates in this record are what payroll will rely on, so they need to be right.
The organisation design review worksheet#
Run this for one unit at a time.
Structure
- Number of positions, occupied and vacant
- Number of layers from the unit head to the frontline
- Span of control for each manager position
- Positions without a funding source
Accountability
- Five recent decisions traced to who actually made them, compared with the chart
- Approvals made by someone other than the formal manager in the last quarter
- Employees reporting to vacant or terminated manager positions
Temporary arrangements
- Acting arrangements, with start dates, end dates and days overdue
- Secondments in and out of the unit
Decisions
- Spans to widen or narrow, and why
- Layers to remove or roles to redesign
- Acting arrangements to confirm, extend or end
- Owner and date for each change
Our view#
We think the org chart should be a by-product of good position data, not a diagram someone maintains in a presentation tool. When the structure lives in positions with effective dates, the chart is always current and every report built on it is too.
And we'd be firm on acting arrangements. They're useful for a few weeks or months. Past six months, they're a structural decision being avoided, and the person acting deserves a clear answer.
Worked example#
A regional council operations division (illustrative)
| Measure | Before review | After review |
|---|---|---|
| Positions | 186 | 182 |
| Layers, director to frontline | 6 | 5 |
| Manager positions with a span of 1 or 2 | 9 | 2 |
| Median span of control | 5 | 8 |
| Acting arrangements over 6 months | 7 | 1 |
| Employees reporting to a vacant manager position | 14 | 0 |
The review removed one layer by merging two coordinator levels, which took four manager positions out (186 − 4 = 182). Six of the seven long-running acting arrangements were resolved: four acting people were appointed, and two arrangements ended with the substantive holders back. The 14 people who'd been reporting to an empty seat were reassigned the same week. Leave approvals that had been bouncing between three supervisors now go to one.
What HR should monitor#
| What to watch | Measure | When to act |
|---|---|---|
| Span outliers | Manager positions with a span of 1 to 2, or over 20 | Any new outlier |
| Orphaned reports | Employees reporting to a vacant or terminated manager position | More than zero after one week |
| Overdue acting arrangements | Arrangements past their end date | Any overdue arrangement |
| Unfunded positions | Positions without a funding source | Any position |
| Long-term vacancies | Positions vacant for more than 90 days | Review whether the position is still needed |
How EmployeeConnect helps#
EmployeeConnect manages positions, job families and reporting lines as dated records, so the org chart comes straight from the position structure and shows vacancies and acting arrangements as they are. Acting arrangements carry start and end dates, and reports on spans, layers and people reporting to vacant positions can run on any unit, on any date.
Frequently asked questions #
What is position management?
Managing the organisation as a set of positions (seats) that people occupy, rather than as a list of people. It lets you report vacancies, budget by position and restructure without retyping employee records.
What's a good span of control?
It depends on the work. Rostered, standardised work can support 10 to 20 direct reports; complex specialist work suits 4 to 7. Spans of 1 or 2 usually point to a structure built around people rather than work.
How long should someone act in a role?
Weeks or months, with a planned end date. If an arrangement passes six months, decide whether to appoint the person, recruit, or end the arrangement.
Do acting employees get paid more?
Many awards and enterprise agreements include higher duties provisions. Check the instrument that covers the employee and record the dates accurately, because payroll relies on them.
How often should we review the structure?
Run the worksheet annually for every unit, and whenever a unit changes leader, grows or shrinks by more than 10%, or goes through a restructure.
Changelog #
- : Initial guide prepared.
