Workforce planning

    Roster planning: how to build rosters for demand, coverage and employee availability

    We help multi-site employers plan rosters for demand and coverage, check them before publishing and measure whether they worked.

    Practical field guide

    We help multi-site employers plan rosters for demand and coverage, check them before publishing and measure whether they worked.

    The short answer#

    A good roster puts the right number of people with the right skills in the right place at the right time, at a cost you planned, within the rules of the award or agreement, and in a way employees can live with. Build it in five steps: forecast demand by site and shift, record availability, apply recurring patterns as the starting point, fill gaps through open shifts, and review coverage exceptions before you publish. Then measure whether it worked: actual hours against rostered hours, unfilled shifts, overtime and late changes.

    Most roster problems start before anyone opens the rostering screen. Demand isn't defined, availability lives in text messages, and nobody checks the published roster against the award. This guide fixes those, and ends with a weekly roster planning checklist.

    How do you work out roster demand?#

    Demand is the number of people (and skills) each site needs in each time block. Define it from the work, not from last week's roster:

    • Activity drivers. Occupied beds, client visits, forecast sales, production volume, scheduled jobs.
    • Ratios and minimums. Legislated or contracted staffing ratios, minimum safe staffing, supervision requirements, mandatory qualifications on each shift (for example, a first aider or a registered nurse).
    • Time profile. Peaks and troughs across the day and week. A flat 9-to-5 demand curve is almost never true.

    Express demand as a requirement per site, per time block, per skill: "Ward 4B, 7am to 3pm, 5 RNs and 3 AINs, one RN with medication endorsement." That's the line the roster has to cover.

    How do you manage availability?#

    Availability is what employees can work: contracted hours, agreed days, approved leave, regular unavailability, and preferences. Two rules make it usable:

    • Record it in one place. Availability sent by text or email can't be checked when the roster's built.
    • Separate commitments from preferences. A part-time employee's agreed days under the award are a commitment. A preference for mornings isn't. Rostering engines and managers should treat them differently.

    Approved leave should flow straight into availability, so nobody's rostered on a day they're on leave.

    Why start from recurring patterns?#

    Most workforces have a stable core: the same people on similar shifts each week. Recurring roster patterns capture that core, so each week starts mostly built and managers spend their time on the exceptions. Patterns also give employees predictable hours, which matters for retention and for part-time employees whose regular hours are set by agreement.

    Review patterns quarterly. A pattern that needs heavy editing every week isn't a pattern anymore.

    How should open shifts work?#

    An open shift is a gap posted for eligible employees to claim. It works when:

    • only people with the required skills and qualifications can see it
    • claiming it can't breach rules on minimum rest, maximum hours or overtime triggers without a warning
    • there's a deadline, after which the manager fills it directly or books agency cover

    Open shifts give casual and part-time employees fair access to extra hours and reduce the manager's phone calls. Track fill rate and time to fill for open shifts as a measure of how well the roster's working.

    What should you check before publishing?#

    Review every roster against a short list of coverage exceptions before it goes out:

    • Under-coverage. Any time block below demand or below a mandatory skill minimum.
    • Over-coverage. Paid hours above demand, often a sign of patterns that haven't been updated.
    • Award and agreement rules. Minimum engagement, minimum breaks between shifts, maximum consecutive shifts, notice of roster changes, and penalty rate exposure.
    • Fatigue. Long runs of shifts, quick returns, and back-to-back night shifts.
    • Cost. Rostered cost against the budget for the week, with penalties and overtime estimated.

    Most modern awards require notice of roster changes and consultation before changing regular rosters or ordinary hours. Publish on time and record changes after publishing, with the reason.

    How do you know if the roster worked?#

    Measure after the week, not just before it:

    • Actual vs rostered hours by site and shift
    • Unfilled shifts and how they were covered (overtime, agency, left short)
    • Late changes after publication, and why
    • Overtime and penalty cost against budget
    • Employee-requested changes and swaps

    A site with high late changes and high overtime usually has a demand forecast problem, not a people problem.

    The weekly roster planning checklist#

    Before building (Monday)

    • Demand confirmed for each site, shift and skill
    • Approved leave and availability changes loaded
    • Recurring patterns applied

    Building (Tuesday to Wednesday)

    • Gaps posted as open shifts with a claim deadline
    • Mandatory skills covered on every shift
    • Minimum rest and maximum hours checked

    Before publishing (Thursday)

    • No under-coverage left unexplained
    • Over-coverage reviewed and trimmed
    • Rostered cost within the weekly budget, or variance approved
    • Roster published with the notice the award or agreement requires

    After the week (following Monday)

    • Actual vs rostered hours reviewed
    • Unfilled shifts, late changes and overtime explained
    • Pattern or demand changes recorded for next week

    Our view#

    We think rostering is a demand problem disguised as a scheduling problem. Organisations that define demand properly, by site, time block and skill, spend far less time fixing rosters and far less money on overtime and agency cover.

    And we'd be firm on one point: the roster isn't finished when it's published. The review of actual against rostered hours is what turns a weekly scramble into a system that gets better.

    Worked example#

    An aged care home, one week (illustrative)

    Measure Rostered Actual
    Care hours 2,940 3,052
    Shifts posted as open 24 –
    Open shifts claimed by staff – 19
    Shifts covered by agency – 3
    Shifts left short – 2
    Overtime hours 40 96

    Actual care hours ran 112 hours over the roster (3,052 − 2,940). The review shows 56 of the extra overtime hours (96 − 40) came from two night shifts covered by day staff staying on, after two open shifts went unclaimed. Both were on the same weekday. The fix is a recurring night pattern for that day, with two permanent part-time employees offered extra contracted hours. At an overtime rate of $78 an hour against an ordinary rate of $45, moving those 56 hours to ordinary time saves 56 × $33 = $1,848 a week, or about $96,000 a year, while giving residents consistent night staff.

    What HR should monitor#

    What to watch Measure When to act
    Coverage Shifts below demand or missing a mandatory skill Any shift left short
    Open shift fill Share of open shifts claimed before the deadline Below 80% at a site for two weeks
    Late changes Changes after publication, by reason A rising trend at any site
    Overtime Overtime hours vs plan by site Above plan for two consecutive weeks
    Fatigue Employees with short rest breaks or long runs of shifts Any breach of the award minimum

    How EmployeeConnect helps#

    EmployeeConnect rostering builds rosters from site and shift demand, employee availability, approved leave and recurring patterns, then lets eligible employees claim open shifts. Coverage exceptions, rest-break warnings and rostered cost are visible before you publish, and actual hours from time and attendance flow back so you can compare the plan with what happened.

    Frequently asked questions #

    How much notice do we have to give of a roster change?

    It depends on the award or enterprise agreement. Many modern awards require notice of a roster change and consultation before changing regular rosters or ordinary hours. Check the instrument that covers each group.

    What's an open shift?

    A rostered gap posted for eligible employees to claim, usually with a deadline. It's a fair way to offer extra hours and reduces last-minute phone calls.

    Should part-time employees' availability be treated as fixed?

    Their agreed regular hours and days are a commitment under most awards. Preferences beyond that aren't. Keep the two separate in your records.

    How do we reduce overtime?

    Measure where it happens. Most overtime clusters on predictable shifts and days, which can be fixed with patterns and contracted hours rather than overtime.

    How often should recurring patterns be reviewed?

    Quarterly, and whenever demand changes materially, like a new service, a new site or a change to staffing ratios.

    Changelog #

    • : Initial guide prepared.

    This guide is general information for Australian employers. It isn't legal, tax or financial advice, and it doesn't take your circumstances, award, enterprise agreement or contracts into account.

    A practical next step

    See what fits your organisation